Review Guide

The Aim of a Review

When performing a review of a cell, you are allowed to make changes you deem necessary to bring it up to the standards we have set; small things like clutter arrangement, fixing bugs, etc. can be done at your discretion. Some changes that also fit under this category could be removal of water features from tombs for example (they were used everywhere to try to make a place interesting, instead they became trite, things of that nature should be more sparse).


For larger scale changes like extensive room layout changes or just general gripes with the overall cell, send your leads (nic(k) or UCM) a message on discord. We will take a look and see if it does need changes or not. At this point we will contact the original designer to say what we think is an issue and propose a change. You can either do this change yourself or you can hand the cell back over to the original designer to complete. If the original designer is no longer on the project, then it is up to your judgement.


The aim of this is to raise the quality level of all cells in the game. Your review will be one of the last set of eyes that will see the cell before release. Use your best judgement and only pass a cell along if you believe the cell is release-ready.

Review Claims

On Clickup the review process is divided into three columns. 



While not part of the main review pipeline, two other cells are important to keep in mind


If the cell passes muster, please move the card to "Incoming QA For Next Build"

Review Process for All Cells

Location Specific (Residential Areas)

Location Specific (others coming later)